i). SAAFI SANA LTD


-System size;
171kWp-Grid tied.

-Location-Mtwapa-Mombasa.

-Inverters; 3 pcs of 50KWac Huawei grid tied Inverters.

-Solar panels; s216pcs-535W jinko modules, 96pcs 580W Jinko Modules.

-Year: 2024

-Scope:Partly subcontracted for installation work.
ii). JKIA

-System size; 187kWp-Grid tied.

-Location-JKIA-Nairobi.

-Inverters; 5 pcs of 36KWac Huawei Inverters.

-Solar panels; 408 pcs of 460W Jinko Solar panels

-Year: 2024

-Scope:Partly subcontracted for decommissioning and reinstallation of the existing solar system
iii).UPPERHILL CHAMBERS

-System size; 87.6kWp-Grid Tied

-Location-Upper Hill-Nairobi

-Inverters; 5 pcs of 25KWac SMA inverters.

-Solar panels; 240 pcs of 365W jinko solar panels.

-Year: 2024.

-Scope:Partly subcontracted for decommissioning and reinstallation of the existing solar system

iv). K De IGRATIUM INTERNATIONAL



-System size; 48.84 kWp/40kWh-Hybrid.

-Location-Marsabit Kenya

-Inverters;1 pc of 50KW DEYE HV.

-Solar panels; 88 pcs of 555W Jinko panels

-Batteries: 8 pcs of 5.12kWh Deye HV lithium ion batteries

-Year: 2024

-Scope:Design & installation works

v). KENAFRIC INDUSTRIES LTD

-System size; 849.58kWp-Grid Tied.

-Location-Nairobi-Kenya

-Inverters;4 pcs of 200KWac Huawei Inverters

-Solar panels; 1531 pcs of 555W Jinko solar panels

-Year: 2024

-Scope:Partially subcontracted for Installation,Testing and Commissioning.